Building blocks



Schleith requested a Terex CTT 162-8 for the second stage of construction on the Matthias-Claudius-Haus nursing home in Waldhut. Erected in cramped hillside conditions, the crane, on hire from Meier-Krantechnik, is being used for a wide range of construction tasks, including lifting heavy prefab concrete modules.


Back to Feature Details