Carrying the weight of the world
Sarens provided 24 strand jacks and 12km of strands to raise the crowning dome of the Al Wasl Plaza into place.
-
Sarens provided 24 strand jacks and 12km of strands to raise the crowning... -
Al Faris was awarded the contract to lift and install 42 structural steel... -
Sarens provided 24 strand jacks and 12km of strands to raise the crowning... -
Al Faris was awarded the contract to lift and install 42 structural steel...