Highs and lows



Tat Hong deployed its 1,250t capacity Demag CC6800 and a 600t Demag CC2800/1 for the construction of Track 4A, a combined-cycle power plant in Pasir Gudang, Malaysia. The job requires the lifting and installing of heat recovery steam generator (HRSG) modules.


Back to Feature Details