The strongest of all
XCMG’s XCA750 was designed to meet the needs of wind turbine maintenance work.
-
-
The recently launched 400t (450USt) Grove GMK6400-1. -
Integrated Logistics used a Demag AC 1000 and an AC 500 to carry out a tandem... -
The 400t Tadano ATF 400G-6. -
A Liebherr LTM 11200-9.1 from Max Bögl’s fleet assembling the lower sections... -
XCMG’s XCA750 was designed to meet the needs of wind turbine maintenance work.