Building blocks
Schleith requested a Terex CTT 162-8 for the second stage of construction on the Matthias-Claudius-Haus nursing home in Waldhut. Erected in cramped hillside conditions, the crane, on hire from Meier-Krantechnik, is being used for a wide range of construction tasks, including lifting heavy prefab concrete modules.
-
At 25 stories Victoria Hall remains the UK’s tallest modular building. A... -
Schleith requested a Terex CTT 162-8 for the second stage of construction on... -
Another option for transporting and lifting prefabricated elements are Wolff... -
At 25 stories Victoria Hall remains the UK’s tallest modular building. A... -
-
Singapore’s Housing and Development Board has used prefab concrete sections... -
Mobile tower cranes at a B&K structures project at Pinewood studios, lifting... -
Mobile tower cranes at a B&K structures project at Pinewood studios, lifting...