This project, in Zambana (also in the Trento province) involved the lifting, transportation and installation of a small 340 ton prefabricated bridge (sixty metres long by seventeen wide) over a river, using 4 x 4 axle lines of SPMTs, positioned on the four corners of the bridge, which was actually moving into place over the old bridge that it was to replace.
Fagioli launches bridge
Although on a much smaller scale, Fagioli also recently used part of its SPMT fleet to install another bridge in the same area of Italy.