This project, in Zambana (also in the Trento province) involved the lifting, transportation and installation of a small 340 ton prefabricated bridge (sixty metres long by seventeen wide) over a river, using 4 x 4 axle lines of SPMTs, positioned on the four corners of the bridge, which was actually moving into place over the old bridge that it was to replace.