Details:

Contractor shall furnish and install one 30t bridge crane and support structure for building 103 at Anniston Army Depot. The crane shall be designed and constructed to CMAA 70 Class D. Installation is to be complete and equipment operational within 90 calendar days after date of award.

Contact:

Shirley T. Wooten

Tel: 256-235-4121

E-mail: shirley.t.wooten@us.army.mil