The turbine, the first in the county of Somerset, is an E70-E4 2Mw machine with a hub height of 65m.
The 500t Liebherr LTM1500 was initially rigged on 135t counterweight and guyed main boom for the erection of the tower sections, with the heaviest section weighing 53t. The crane was then reconfigured and a 42m luffing fly jib added for the erection of the generator weighing 51t and also the hub & blade lift.
All lifts were completed over a six-day period.