Pennsylvania, USA-based crane rental firm Allegheny Crane and Rigging recovered a Port Authority bus from the Fern Hollow bridge collapse in Pittsburgh.

The bridge collapsed just hours before President Biden was due in the city to talk about infrastructure renewal, highlighting the urgency for action.

For the lift Allegheny used a Liebherr LTM 1350 with Y guides and 118’ of luffer. A Grove GMK275 Children’s Hospital crane was used as an auxiliary crane. The load weighed 20.3 tonnes (44860lbs).

FOR MORE REGARDING USA INFRASTRUCTURE ISSUES SEE THE MARCH ISSUE OF CRANES TODAY: https://content.yudu.com/web/442ay/0A444jv/Cranes0322-Pros/html/index.html