The cranes have been mounted on Mach2 and Mach3 tracked vehicles and are working to lift and position the pipes and welding cabins.

The welding cabins are lifted into place by the cranes

The welding cabins house two welding robots and two operators, and are positioned at the joint connecting two sections of pipe. When the pipes have been put in position by the cranes, the welding cabin is then used to join them.

The cranes are working on a 37km-long stretch of pipeline