Raimondi Middle East has deployed 12 of the 14 tower cranes initially allocated to the construction of Madar Mall in Sharjah, United Arab Emirates (UAE).

The equipment is being used at the retail, leisure and entertainment development within Arada’s Aljada megaproject.

The cranes currently operating on site comprise six T577s and six MRT294s. Two further cranes, an MRT294 and an MRT159, are scheduled to be installed shortly, while additional machines may be added at a later stage.

The deployment marks the first use of the T577 model in the Middle East and North Africa region, according to Raimondi.

The T577 has a maximum lifting capacity of 24t and is being used to handle precast concrete panels and structural steel components.

In UltraLift mode, it has a tip load of 3.41t at an 80m radius, with a maximum hoisting speed of 110m per minute and a drum capacity of 1,030m.

The 12 cranes are operating at freestanding heights ranging from 41 to 60m, with jib lengths of up to 60m.

Their maximum lifting capacities range from 16 to 24t, reflecting the different requirements of the construction site.

Raimondi Middle East general manager Wael Hasan said: “The deployment of six T577s at Madar Mall marks an important milestone for Raimondi Middle East, reflecting our commitment to support the delivery of increasingly ambitious construction projects across the Emirates and the wider GCC.”

The company said the installation programme required coordination between the project parties on site readiness, logistics, installation schedules and resource allocation.

Raimondi Middle East has supplied 41 cranes for projects across the wider Aljada development, according to the company.

It also said that 100 of its cranes were operating simultaneously across the UAE earlier this year.