The load was 84ft (26m) long, 24ft (7m) wide and 26ft tall. It passed through a tight railway crossing on its way to the port.

The Global Lifting Industry’s Longest Running Magazine, Serving Since 1972.
Emmert International moved a cyclonic separator through Freeport, Texas.
The load was 84ft (26m) long, 24ft (7m) wide and 26ft tall. It passed through a tight railway crossing on its way to the port.