LR 1800-1.0 installs Berlin bridge
The new bridge was transported from Bavaria to Berlin over 1,600km by barge on inland waterways.
-
The LR 1800-1.0 hoisted the 196t range with a radius of 48m. -
The new bridge was transported from Bavaria to Berlin over 1,600km by barge...