Building blocks
Mobile tower cranes at a B&K structures project at Pinewood studios, lifting in prefabricated timber cassettes used for the roof and façade of the building.
-
At 25 stories Victoria Hall remains the UK’s tallest modular building. A... -
Schleith requested a Terex CTT 162-8 for the second stage of construction on... -
Another option for transporting and lifting prefabricated elements are Wolff... -
At 25 stories Victoria Hall remains the UK’s tallest modular building. A... -
-
Singapore’s Housing and Development Board has used prefab concrete sections... -
Mobile tower cranes at a B&K structures project at Pinewood studios, lifting... -
Mobile tower cranes at a B&K structures project at Pinewood studios, lifting...